The ABMI Group has been active in the oil and gas chemical sector since 2005. We support in the management of petrochemical plant and gas infrastructure projects.
Petrochemical processes, process flow diagram studies, energy efficiency, industrial plant design, industrial process design, specifications, sizing
Technical coordination, project management, planning and scheduling
Industrial automation, control systems, predictive maintenance, flow optimisation, safety instrumented systems (SIS)
Process safety, petrochemical HSE, risk analysis (HAZOP, HAZID), inspection and control
Ensure reliable deliveries, reduce non-quality costs, and strengthen competitiveness by improving the supply chain, production methods, and process control.
Studies enabling the remanufacturing and improvement of mechatronic components and assemblies without the specifications or traceability of your original supplier.
Civil engineering, project management, water treatment, dimensioning, urban planning, project management, catenary studies, HVAC and fluids, mechanics, passenger information, transport systems, quality… Our employees work on all building and transport infrastructure: metro, train, tramway and bus.
Real-time 3D applications: From customising standard solutions to tailor-made developments. Advice for safe and sensible adoption: From identifying uses to choosing technologies. Design of innovative, tailor-made tools.
Specialising since 2007 in the design and development of native iOS and Android mobile applications, Openium has a team of 34 employees. The agency has all the internal resources necessary to successfully design the mobile projects entrusted to it.
Since 2007, Rtone has been developing smart, connected products. With its multidisciplinary team, Rtone supports you throughout your project, from defining use cases to leveraging data.
Support for the project purchasing department at EDF’s engineering centre, working on activities related to civil engineering, electricity, automation and control systems. The aim is to optimise purchasing management in order to respond effectively to the needs of the Engineering Department.
ABMI a assuré un ramp-up d’effectifs important, rapidement et qualitatif, structuré autour d’une organisation sécurisant la qualité des livrables et du niveau de services. Continuité de service maintenue malgré les difficultés opérationnelles pendant la crise COVID.
We are involved in the design phase of the Métropole Nice Côte d’Azur wastewater treatment and recovery complex. This project represents the largest wastewater treatment plant in France and one of the largest in Europe. A true international environmental showcase, it aims to address the challenges of climate change while strengthening the region’s resilience.
Our teams delivered the models on time, with scalable detail granularity, in line with the project requirements.
ABMI a atteint les objectifs que nous avions fixés au contrat. Les collaborateurs ont présenté des capacités techniques et organisationnelles permettant de faire face aux divers enjeux du site. Capacité à proposer des solutions pour tenir les jalons économiques et délais, suivant les exigences pharmaceutiques de Bonnes Pratiques de Fabrication.